Marae Upgrade

When dealing with commercial and industrial waste, care needs to be taken. These situations are not a 'size fits all'.

CS400P system

With upgrades being done to the Marae, the wastewater system was needing to be brought up to standard. The commercial sized Naturalflow systems fitted with their environmental philosophy, and had the capacity required.

We removed the existing septic tank, using the hole created to install the new system in the same location. We also upgraded the land application to system to meet the council requirements.