Packhouse Accomodation CSA370
When dealing with commercial and industrial waste, care needs to be taken. These situations are not a 'size fits all'.With large seasonal fluctuations, this kiwifruit packing facility needed capacity for peak season staff. A custom designed system by WaterFlow met the requirements for the project, with the capacity to process up to 54,000L per day.
Due the size of the components, it was necessary to assemble to modules in place, rather than ship completed modules. This allowed us to use local suppliers where possible and keep the cost down.